Taboos and Measures of Drainage Valve Pipeline Construction

Taboos and Measures of Drainage Valve Pipeline Construction

1: The main materials, equipment and products used in construction are short of technical quality appraisal documents or product certificates that meet the current standards issued by the state or ministry. Consequences: The quality of the project is not up to standard, there are hidden dangers of accidents, can not be delivered on time for use, must be repaired, resulting in delays in the construction period, increased investment in labor and materials. Measures: The main materials, equipment and products used in water supply, drainage and heating and sanitation projects shall be technical quality appraisal documents or product qualification certificates issued by the state or ministry in accordance with the current standards; the product name, model, specifications, national quality standard code, date of departure, name and location of the manufacturer, inspection certificate or code of the manufacturer shall be marked.

Installation of water valve- Ductile iron ball check valve and Electric actuated butterfly valve

2: The necessary quality inspection is not carried out before the valve is installed. Continue reading “Taboos and Measures of Drainage Valve Pipeline Construction”